Excavation questions before the bucket moves

Call for locates, keep spoil back from the edge, and figure bank yards and loose yards. Davina will not invent a slope angle.

  1. Locate utilities and respect the marks. Hand dig where the locate requires it.
  2. Decide the protective system with a competent person before anyone goes in.
  3. Use the calculator for bank cubic yards and loose yards after swell.
  4. If water, vibration, or previously disturbed soil shows up, stop and redo the plan.
Ask DavinaOpen calculators

Common questions

Is a shallow trench exempt?

Depth and soil decide the protective system under the excavation rules. Davina will not give you a universal depth to ignore.

What is swell?

Bank yards are the hole. Loose yards are what the truck hauls after the soil expands. You type the percent.